Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, gl
Our objectives in writing Project Scheduling: A Research Handbook are threefold: (1) Provide a unified scheme for classifying the numerous project scheduling pr
This book introduces the field of resource-constrained project scheduling. State-of-the-art reviews of optimal and heuristic procedures are provided for classic