Final Safety Evaluation Report on the Construction Authorization Request for the Mixed Oxide Fuel Fabrication Facility at the Savannah River Site, South Carolina
Author | : U.s. Nuclear Reglatory Commission |
Publisher | : CreateSpace |
Total Pages | : 560 |
Release | : 2014-06-09 |
ISBN-10 | : 1500140082 |
ISBN-13 | : 9781500140083 |
Rating | : 4/5 (82 Downloads) |
Download or read book Final Safety Evaluation Report on the Construction Authorization Request for the Mixed Oxide Fuel Fabrication Facility at the Savannah River Site, South Carolina written by U.s. Nuclear Reglatory Commission and published by CreateSpace. This book was released on 2014-06-09 with total page 560 pages. Available in PDF, EPUB and Kindle. Book excerpt: On February 28, 2001, Duke COGEMA Stone & Webster (DCS or the applicant), a limited liability company, submitted a request to the U.S. Nuclear Regulatory Commission (NRC) to construct a Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF or the facility) on the U.S. Department of Energy's (DOE) Savannah River Site near Aiken, South Carolina. DCS is a DOE contractor. If its construction authorization request (CAR), as revised, is approved, DCS is expected to then submit a license application for authority to possess and use licensed material at the MFFF. Following an acceptance review of such an application, a notice of opportunity for hearing would be published in the Federal Register. In support of its revised CAR, DCS has submitted several items to the NRC, including a quality assurance plan and an environmental report.