Pre-application Document
Author | : Alaska Energy Authority |
Publisher | : |
Total Pages | : |
Release | : 2011 |
ISBN-10 | : OCLC:865582227 |
ISBN-13 | : |
Rating | : 4/5 (27 Downloads) |
Download or read book Pre-application Document written by Alaska Energy Authority and published by . This book was released on 2011 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Alaska Energy Authority is filing this Notice of Intent and Pre-Application Document with the Federal Energy Regulatory Commission for an original license for the Susitna-Watana Hydroelectric Project, FERC no. 14241. As proposed, the Project would include construction of a dam, reservoir, and power plant on the Susitna River starting at river mile 184, approximately 34 miles upstream of Devils Canyon. Transmission lines connecting into the existing Railbelt transmission system and an access road would also be constructed. The FERC License Application is scheduled for filing on or about September 2015. This document is primarily a description of the project. A small section (Section 5) reviews issues at stake and studies to be conducted.