A Archaeological Survey for Historic Properties Within the Batchtown Habitat Rehabilitation Enhancement Project (HREP), Environmental Management Program (EMP), Pool 25, Mississippi River Calhoun County Illinois. Phase 1. Cultural Resource Management Report, Number 249

A Archaeological Survey for Historic Properties Within the Batchtown Habitat Rehabilitation Enhancement Project (HREP), Environmental Management Program (EMP), Pool 25, Mississippi River Calhoun County Illinois. Phase 1. Cultural Resource Management Report, Number 249
Author :
Publisher :
Total Pages : 152
Release :
ISBN-10 : OCLC:227852149
ISBN-13 :
Rating : 4/5 (49 Downloads)

Book Synopsis A Archaeological Survey for Historic Properties Within the Batchtown Habitat Rehabilitation Enhancement Project (HREP), Environmental Management Program (EMP), Pool 25, Mississippi River Calhoun County Illinois. Phase 1. Cultural Resource Management Report, Number 249 by :

Download or read book A Archaeological Survey for Historic Properties Within the Batchtown Habitat Rehabilitation Enhancement Project (HREP), Environmental Management Program (EMP), Pool 25, Mississippi River Calhoun County Illinois. Phase 1. Cultural Resource Management Report, Number 249 written by and published by . This book was released on 1995 with total page 152 pages. Available in PDF, EPUB and Kindle. Book excerpt: Report describes results of Phase 1 archaeological & geomorphological survey of 121 ac. within the Batchtown Habitat Rehabilitation Enhancement Project (HREP), Pool 25, Mississippi River (mile 242 to mile 248, left bank), Calhoun County, Illinois. The project involves construction/enlargement of levees and 7 water control structures. Pedestrian survey and shovel testing located 3 prehistoric sites (11-C-2O6, 11-C-2O8, 11-C-209), 3 historic sites (11-C-2O5, 11- C-207, 11-C-211), and 1 prehistoric & historic site (11-C-21O). Potentially eligible sites 11-C-2O7, 11-C-2O8, 11-C-2O9 & 11-C-21O will be avoided by the project. Geomorphological investigations revealed land forms with potential for buried sites in the project's central portion; other areas have very little potential for containing cultural deposits. Project clearance in surveyed areas in regard to cultural resources is recommended. Survey was conducted in June, 1994 by American Resources Group, Ltd., for the U.S. Army Corps of Engineers, St. Louis District on lands managed for waterfowl by the U.S. Fish & Wildlife Service and the Illinois Department of Natural Resources. The project is planned under the HREP, Environmental Management Program (EMP) established to enhance & rehabilitate the Upper Mississippi River system. (AN).


A Archaeological Survey for Historic Properties Within the Batchtown Habitat Rehabilitation Enhancement Project (HREP), Environmental Management Program (EMP), Pool 25, Mississippi River Calhoun County Illinois. Phase 1. Cultural Resource Management Report, Number 249 Related Books

A Archaeological Survey for Historic Properties Within the Batchtown Habitat Rehabilitation Enhancement Project (HREP), Environmental Management Program (EMP), Pool 25, Mississippi River Calhoun County Illinois. Phase 1. Cultural Resource Management Report, Number 249
Language: en
Pages: 152
Authors:
Categories:
Type: BOOK - Published: 1995 - Publisher:

DOWNLOAD EBOOK

Report describes results of Phase 1 archaeological & geomorphological survey of 121 ac. within the Batchtown Habitat Rehabilitation Enhancement Project (HREP),
The Goodwyn Will Case
Language: en
Pages: 400
Authors:
Categories:
Type: BOOK - Published: 1905 - Publisher:

DOWNLOAD EBOOK

Government Reports Announcements & Index
Language: en
Pages: 676
Authors:
Categories: Science
Type: BOOK - Published: 1996 - Publisher:

DOWNLOAD EBOOK

A Phase I Archaeological Survey for Historic Properties Within the Stump Lake Complex, Habitat Rehabilitation Enhancement Project (HREP), Pool 26, Illinois River, Jersey County, Illinois
Language: en
Pages: 0
Authors:
Categories: Archaeological surveying
Type: BOOK - Published: 1995 - Publisher:

DOWNLOAD EBOOK

This report describes the results of a Phase I archaeological survey of 207 ac. within the Stump Lake Waterfowl Management Area, located in Pool 26, Illinois Ri
Archaeological Survey
Language: en
Pages: 162
Authors: Brian Leigh Molyneaux
Categories: Social Science
Type: BOOK - Published: 2003-04-16 - Publisher: Rowman Altamira

DOWNLOAD EBOOK

Two longtime fieldworkers offer mentors' advice on finding and mapping archaeological sites. They outline the logic behind field surveying and the various desig